4 May 2020
Wagenborg’s MV Cito Ships Project Cargo for Sleipnir To and From Norway
Topics: Amoyfjord, BosKalis, Denmark, Fredericia, Heerema Marine Contractors, MV Cito, Newcastle, Norway, rotterdam, SSCV Sleipnir, Vlissingen, Wagenborg
Recently the 3,450t Wagenborg vessel MV Cito shipped a project cargo to Amoyfjord in Norway for Heerema Marine Contractors (HMC).
Upon arrival in Amoyfjord, the MV Cito went alongside the crane vessel SSCV Sleipnir, the largest and strongest crane vessel in the world with two cranes on board of 10,000 tons each. Here, various materials were discharged including slings weighing 90 tonnes each.
Subsequently, the Cito loaded materials to be shipped back to Vlissingen.
Last week the same vessel carried two reels to Fredericia in Denmark for Boskalis. the first reel was loaded in Rotterdam and the second in Newcastle
Source Royal Wagenborg
Related news
21 Aug 2018
Last chance: Early Bird Rates Heavy Lift Seminar Rotterdam
30 Aug 2024
Heerema’s Sleipnir Completes 13,000t Offshore Converter Platform Lift for RWE Offshore Wind GmbH
28 Jan 2019
SAL Heavy Lift Bridges the Gap Between China and Norway
SAL Heavy Lift delivers 12 bridge sections for the Beitstadsundbrua bridge from China to Norway.