Wagenborg Foxdrill’s Innovative Solution to Replace Two 14t Cylinders on Knuckle Boom Cranes With No Downtime
This was an extraordinary job, because with a length of 7.5m and a weight of almost 14t, these cylinders are not easy to handle. Foxdrill’s team of engineers and rope access specialists developed a safe lifting solution. This involved using the upper arm of each knuckle boom crane. To this, the rope access team attached the necessary rigging, consisting of an ingenious combination of chain hoists.
After disconnecting the hydraulic hoses and removing the fixing pins, the rope access team carefully lowered the cylinder several meters to a position where it could be picked up by one of the other knuckle boom cranes.
The installation of the new cylinders involved carrying out the operation in reverse order.
Result? Zero downtime, uninterrupted drilling, and substantial cost savings.