5 Nov 2020
Baumann’s Goldhofer THP/SL-L Modules Hauling Two Gigantic Heat Exchangers for Linde – Gallery
Could this be a record heavy haulage operation?
The first test lift in Bornheim of Viktor Baumann’s new Greiner GmbH 450t combination scissor lift bridge has been successful.
For this purpose, the bridge was loaded with 450t of crane ballast and pumped up until the lower edge was 1.90m above the ground.
This new system is precisely tailored to the heavy haulage market of the future with increasing load weights.
Source
Could this be a record heavy haulage operation?