Video: Tideway TBM lowered 53m ahead of tunnel drive – Heavy Lift News
25 Jun 2018

Video: Tideway TBM lowered 53m ahead of tunnel drive

25 June, 2018

The first of two Tunnel Boring Machines (TBMs) for use on the Thames Tideway project has been lowered into position ahead of the tunnel drive.

Tideway, the company building London’s “super sewer”, installed the machine at its Kirtling Street site near Battersea Power Station.

Related news