
2 Nov 2020
25 June, 2018
The first of two Tunnel Boring Machines (TBMs) for use on the Thames Tideway project has been lowered into position ahead of the tunnel drive.
Tideway, the company building London’s “super sewer”, installed the machine at its Kirtling Street site near Battersea Power Station.