
30 Dec 2019
FPSO Triton Crane Overhaul by KenzFiggee
KenzFigee starts crane overhaul on FPSO 'TRITON'
31 May 2018
The proof loads of a permanent mooring system for CALM buoys and FPSOs are typically 80-100% of the design load so that substantial bollard pull capacity is required.
The use of the STEVTENSIONER® for subsea tensioning offers significant cost benefits as it reduces the required load by typically 60%. As a result mooring installations can be performed from modests anchor handlers or crane barges.
Discover how these and more unique features will enable your next project installation.
Watch the pictures and video below:
KenzFigee starts crane overhaul on FPSO 'TRITON'