
16 Jan 2020
Geismar 3 Methanol Plant Levee Crossing and Heavy Haul Awarded to Mammoet
Scope includes heavy haul of breakbulk cargo greater than 100 tons
When UPM Biochemicals asked Mammoet to carry out the transport and heavy lift of several HTC reactors for the new construction of their state-of-the-art biorefinery in Leuna, Germany, the study of Mammoet revealed two challenges:
To overcome narrow curves would be no problem for their SPMT transport configuration and with an alternative route, their team was able to safely complete all work within the tight schedule.
Source
Scope includes heavy haul of breakbulk cargo greater than 100 tons