Turbine Installation Started on Triton Knoll OWF with Wind Osprey – Heavy Lift News
5 Feb 2021

Turbine Installation Started on Triton Knoll OWF with Wind Osprey

TWD recently congratulated DEME on a successful start to the turbine installation on Triton Knoll Offshore Wind Farm in the UK.

The seafastenings for the towers, nacelles, and blade racks were designed by TWD.

By cantilevering the blade racks at the back of Wind Osprey, TWD freed up substantial deck space. This enabled the ship to carry components for five turbine sets per trip.

The TWD engineers finished the project by proudly witnessing the smooth first load-out at ABLE Seaton Port!

To find out how TWD can help your Offshore Wind project, follow the link to their offshore wind solutions.

Source TWD

 

 

Related news