11 Oct 2024
Transport of five 100 tons generators
Date 08 August 2018
Bremer Lloyd has been awarded with the transport of five 100 tons generators with 6 meters diameter.
The scope consisted in the pre-carriage, handling on sea vessel, sea transport, discharging of one generator in Poland, including the on-carriage and pre-carriage and re-loading of an exchange generator. These five generators were transported still on the same vessel direction North Sea Port, where Bremer Lloyd arranged for the discharging and the on-carriage to client’s premises.
Source, photograph: Bremer Lloyd