
Taillevent naming ceremony
Jan de Nul’s wind farm installation vessel Taillevent is named in Ostend – The name ‘Taillevent’ literally translated means ‘cutting the wind’. Photographs – Jan de Nul
Date 26 October 2018
The Jan De Nul Group named its newest offshore installation vessel Taillevent this week in the Belgian port of Ostend. Miss Pauline Stassijns, granddaughter of Director Dirk De Nul, baptised the vessel and wished her success and a safe journey. The De Nul family, employees and their guests attended the christening.
On 18 July 2018, Jan De Nul Group acquired this offshore installation vessel, at that time MPI Discovery, from the Dutch company Vroon Group. The 2011 built Taillevent is designed specifically for the transport and installation of offshore wind turbines and their foundations. It is also perfectly suited to other offshore sectors, such as the oil and gas industry. The vessel is equipped with six spuds to lift the vessel out of the water in order to be able to work in stable conditions. The Taillevent is 140 meters long and can operate in up to 40 metres of water depth. Furthermore, this installation vessel has an on-board crane with a lifting capacity of 1,000 tonnes and an auxiliary crane of 50 tonnes.
Among the guests was Bart Tommelein, Flemish Vice Minister-President of the Flemish Government, Flemish Minister for Budget, Finances and Energy, a supporter of green energy production, who gave a speech: “The offshore sector is important for our Belgian economy. Thousands of jobs derive directly or indirectly from the construction and maintenance of offshore wind turbines. Not only in our country, but also worldwide. I am happy to welcome the Taillevent of Jan De Nul Group as a new asset in our switch to renewable energy.”
Source Jan de Nul