9 Nov 2021 Cadeler A/S Lined Up as Preferred Supplier for Undisclosed Client’s Transport and Installation With O-Class Vessel
8 Oct 2021 Cadeler and Seaway 7 Share Ørsted Award for Gode Wind 3 and Borkum Riffgrund 3 WTG Installation
5 Feb 2021 Turbine Installation Started on Triton Knoll OWF with Wind Osprey The seafastenings for the towers, nacelles, and blade racks were designed by TWD. Read on...