
TWD Delivers to DHL Global Forwarding in 2 Weeks
In Vietnam, TWD assisted DHL Global Forwarding. Read on...
In Vietnam, TWD assisted DHL Global Forwarding. Read on...
The seafastenings for the towers, nacelles, and blade racks were designed by TWD. Read on...
ABCO Marine deployed their jack-up barge with two piling gates designed by TWD. Read on...
Installing on-shore wind turbines in mountainous areas can be a logistical challenge. Read on ...
TWD like achieving milestones together with their clients... Read further for more details...
A 100m long concrete culvert has been immersed in the Thames, right in the center of London. This vital part of London’s new Super Sewer had to be floated-out underneath the historic Blackfriars Bridge. Read On...
Each barge spent on average 35 days to cover the distance between the 2 ports. Read on...
Over the course of the last years TWD developed an advanced friction measurement method and probabilistic verification of monopile stability during transit.
Read more....
TWD has designed transport and installation equipment for Wind Turbine Generator (WTG) components for over 20 offshore wind farms... Read on...