

Steinweg Handling Big and Heavy Components for Rotterdam’s Industry
The C. Steinweg Group successfully managed the discharge and storage of two key components recently at the Steinweg Botlek Terminal.
The two key components for the Shell Energy and Chemicals Park Rotterdam were:
Vacuum Drier/Splitter:
- Length 41m
- Breadth 11m,
- Weight 230t
Product-Stripper:
- Length 30m
- Breadth 5m,
- Weight 62mt

This well-coordinated project was executed in close collaboration with HEBO Maritiem Service B.V. at the group’s newly developed finger pier, designed specifically for outside storage of industrial project parts.
Steinweg serves as an intermediate storage location, offering logistical support to the project across 50,000m² of warehoused and outdoor space for Shell.

The group are pleased that this collaboration continues to progress, with parties recently agreeing to extend the cooperation until the end of 2027.
Source