Saipem Loads Out First Three Topsides for QatarEnergy’s North Field – Heavy Lift News
14 Mar 2024

Saipem Loads Out First Three Topsides for QatarEnergy’s North Field

The first three topsides, consisting of one wellhead production and two riser platforms, were successfully loaded out from Saipem’s Karimun fabrication yard in Indonesia.

 

 

The modules are being installed on the northeast coast of Qatar for QatarEnergy LNG’s North Field Production Sustainability Offshore and Pipelines, EPCOL Project, aimed at sustaining the production plateau of the largest non-associated natural gas field in the world.

 

This pivotal milestone underlines Saipem’s engineering and fabrication capabilities and their significant role in a world-class project.

 

Source   

Related news