Roll Group with Russell Marine Replace Rail Bridge in Texas – Video

Last month Roll Group, with Russell Marine, removed sections of a Union Pacific Railroad bridge across the Trinity River in Liberty, Texas and replaced them with a single new section. First and  Second Old Bridge Section removed : Length     114 feet         (34.75m) Width      19.5 feet      (5.9m) Height       36 feet         (10.97m) Total weight   297USt  (269.43 tonne) … Continue reading Roll Group with Russell Marine Replace Rail Bridge in Texas – Video