Prosperity FPSO Hull Arrives in Singapore for Topside Module Integration - Video – Heavy Lift News
20 Aug 2021

Prosperity FPSO Hull Arrives in Singapore for Topside Module Integration – Video

The hull for the Prosperity FPSO has arrived safely at the Keppel yard in Singapore. Now, the next phase of construction will commence, with the topside modules being integrated at the yard.

Despite the various challenges posed by the ongoing global pandemic, the unit remains on schedule to be completed in 2024. Drydock activities are scheduled to begin in the 4th quarter of this year, with the installation of major structures that will support the Mooring and Subsea Risers.

In keeping the standardization philosophy that guides the Fast4Ward® program, the Prosperity FPSO by in large replicates the design used for the Liza Unity FPSO. This approach has showcased the value of Fast4Ward®, ensuring that the final product is delivered faster to our client ExxonMobil. Once installed, the vessel is intended to produce roughly 220,000 barrels of oil per day and will be able to store around 2 million barrels of crude oil.

On completion, Prosperity will join her sister vessel Liza Unity, currently under construction at the same yard, and Liza Destiny, operational since end of 2019, offshore Guyana.

 

The Prosperity FPSO is eased into her berth along side to her sister vessel Liza Unity which completed the topsides lifting and installation campaign early last summer

The video shows the Liza Unity FPSO, sister vessel to the Prosperity FPSO, which completed a similar topsides lifting campaign in March last year with over 26,000 tons of topsides which were safely lifted in position.

Video

 

Source SBM

Related news