Phase 2 of the Trinity River Rail Bridge Replacement Project with Roll Group - Video – Heavy Lift News
10 Aug 2022

Phase 2 of the Trinity River Rail Bridge Replacement Project with Roll Group – Video

A month ago HeavyLiftNews reported on the first phase of the replacement of the Union Pacific Railroad bridge over the Trinity River in Liberty, Texas. (linked here).

We can now continue the report of this project, the execution of which by Roll Group has been described by The Vindicator, the local newspaper in Liberty, as a “Construction Ballet.”

Performing with the utmost safety, precision, and excellence, Roll Group’s expert engineers orchestrated every intricate detail of this innovative operation. As a result, the execution was implemented seamlessly with ZERO incidents, making it a truly exciting project to be a part of. The Roll Group team was dedicated, even in record-high Texas heat, to getting the remainder of the railroad bridge replaced within the stipulated 24-hour window.

Video

Source RollGroup

 

Related news