OOS International – OOS Gretha placed a 120 ton accommodation module
SSCV OOS Gretha, a heavy lift crane vessel of OOS International BV, successfully placed a 120 ton accommodation module onto the P-19, a Petrobras moored platform in Campos Basin, offshore Brazil.
The accommodation module was initially lifted from an offshore supplier onto the deck of SSCV OOS Gretha, where it was prepared for the transfer to the P-19.
On 25th of July during a short window of favorable weather conditions, the accommodation module was lifted. Whilst the OOS Gretha was in DP Ship Follow mode, the accommodation module was accurately positioned on the starboard forward corner of the P-19.
Another successful lifting project completed!
Photographs: OOS International
Source OOS International
Related news
KENC Engineering Completes Secondary Steel Project for GustoMSC’s Wind Orca Crane
Another Game Changing Design Launched by OOS International: The SSFF Semi Submersible Fast Floatel
ALE Start in Oman for GCC First Wind Farm Project
ALE has demonstrated its wind expertise and turnkey capabilities as they start the receiving operations of wind components in Oman for the Gulf Cooperation Council’s (GCC) first-ever wind farm.