ONE-Dyas' N05-A topside and jacket sail away from HSM Schiedam yard – Heavy Lift News
5 Aug 2024

ONE-Dyas’ N05-A topside and jacket sail away from HSM Schiedam yard

HSM Offshore Energy has successfully completed the load out and sail away of the N05-A topside and jacket for ONE-Dyas at its Schiedam yard in the Netherlands. Upon completion, the NO5-A Platform will be the first electrified gas production platform in the North Sea.

The topside and jacket were positioned onto the H-406 barge, owned by Heerema Marine Contractors, utilizing Self-Propelled Modular Transporters (SPMTs) operated by Mammoet and managed by HSM Offshore Energy. The topside and jacket will be transported to their designated site in the North Sea, where installation will take place. ONE-Dyasanticipates commencing gas production by the end of 2024.

The NO5-A project involves the creation of an offshore platform comprising a topside and a six-legged non-battered jacket. The topside dimensions are 61.5 x 34 x 15 meters, with a weight of 3200 tonnes, while the jacket measures 40 x 20 x 50 meters and weighs 2800 tonnes.

“This achievement marks a significant milestone for HSM Offshore Energy and underscores our dedication to pioneering innovative solutions in the offshore energy sector,” said Hans Leerdam, Commercial Director of HSM Offshore Energy. “The successful load out and sail away of the N05-A topside and jacket is a proof to our team’s expertise and commitment to perfection. We are excited to contribute to the energy transition and a sustainable energy-mix with this groundbreaking project.”

Upon completion, the NO5-A Platform will be the first electrified gas production platform in the North Sea, powered entirely by offshore renewable energy from the nearby Riffgat Offshore Wind Farm. This pioneering project showcases HSM Offshore Energy’s commitment to advancing local Dutch gas production and solidifying its leadership in the offshore energy transition.

Designed as a permanent manned installation, the N05-A platform will operate as a Not Normally Manned Installation (NNMI), making it an Autonomous Production Location (APL). The export route will utilize a pipeline connected to the existing Noordgastransport (NGT) pipeline network, facilitating delivery to customers in the Netherlands and Germany.

With cutting-edge technology and innovative design, the N05-A topside signifies a new era for HSM Offshore Energy, reinforcing its role in accelerating the offshore energy transition. Source: HSM

Related news