
17 Sep 2021
MAX has been supporting the PW2PA Project on the Joy Baluch AM Bridge Duplication by providing its brand new 250t Liebherr LTM 1250-5.1 all terrain mobile crane for unloading steel piles as part of the projects’ early works stage.
The Port Wakefield to Port Augusta Alliance (PW2PA), is a consortium of CPB Contractors, Aurecon and GHD, in alliance with the Department for Infrastructure and Transport. It will deliver the Joy Baluch AM Bridge Duplication in Port Augusta; the Port Wakefield Overpass and Highway Duplication; and the Augusta Highway Duplication Planning Study, between Port Augusta and Port Wakefield.
Source Max Crane & Equipment Hire (SA) Pty Ltd