Malin Abram Heavy Lift Barge Hauled on to Slipway – Heavy Lift News
12 Jul 2021

Malin Abram Heavy Lift Barge Hauled on to Slipway

Malin Abram witnessed their 5000t heavy lift barge being slowly hauled out of the water on a set of giant inflatable rubber rollers recently. This is the first stage of the barge jumboisation process, putting the barge into position on the slipway where it will be split and a new 15m, 500t section inserted.

The extended barge will arrive in Glasgow later this year will in time to be used for the launch of HMS Glasgow.

Sauce Malin Group

Related news