Maersk Honam Section is being Shipped to Hyundai Yard for Re-Build – Heavy Lift News
15 Feb 2019

Maersk Honam Section is being Shipped to Hyundai Yard for Re-Build

The section of Maersk Honam that was not damaged by fire last year was successfully loaded aboard the heavy-lift vessel Xin Guan Hua on open waters outside Dubai (UAE) on Saturday, 2 February. Currently in transit, it is expected to pass Singapore Strait on Monday, 18 February 2019. The heavy-lift vessel will deliver the 228.5-metres-long section from midship to stern at Hyundai Heavy Industries Shipyard in South Korea in March, the same yard the vessel was built in.

At the Hyundai Heavy Industries Shipyard, the sound section of Maersk Honam will be joined with a new build forward section. The former forward section is safely moored at Drydock World Dubai for continued removal of damaged containers and debris. Once cleaned, it will be recycled. In accordance with our Responsible Ship Recycling Standard (RSRS), relevant recycling options are currently being investigated and evaluated.

The rebuilt vessel is expected to resume service again in the second half of 2019.

Source and Photographs – Maersk

Related news