LNG Plant Lifts by Sarens in Algeria
Movement and lifts in a live petrochemical site with space constraint involves meticulous planning and Sarens is a reference in the heavy lift and specialised transport for the Oil & Gas and Petrochemical sector.

Sarens had to lift the Coldbox, lox tank, lin tanks, and other equipment. The most important component was the 47m long cold box weighing 150T. The team decided to deploy:
- CC2800-1 with SSL 72m main boom length
- QUY260
The main crane was selected keeping in mind the length of the 47m long cold box which was the most critical section to be lifted. The equipment was transported from Sarens yard in Algeria and was assembled in 4 days.
The heavy lifts are part of the revamp of the LNG plant built in the 1970s. This project will help reduce maintenance costs, reduce gas consumption rates, and maintain LNG gas production at the GL1Z plant.
Featured Title photograph A Sarens’s CC2800-1 deployed in Sri Lanka in March 2020
Source Sarens
Related news


Sarens Assist Huisman on Saipem Constellation Upgrade Lifting 508t Mast

Vancouver Neptune Terminal Export Facility Gets a Boost from Sarens
Sarens installs new overpass for first phase of major expansion project