
21 Jul 2022
Date 23 July 2018
Jumbo Maritime’s vessel MV Fairplayer installed a new shiploader and tripper car weighing 227 tonne and 59 tonne at Cape Flattery, Australia.
Followed-up by loading the old shiploader and tripper car (weighing 179 tonne and 50 tonne) and delivered them 3.000 km more southerly to Port Kembla.
Source: Jumbo Maritime