Jumbo Offshore on Israel's Leviathan Field with Technip – Heavy Lift News
6 Nov 2018

Jumbo Offshore on Israel’s Leviathan Field with Technip

Jumbo will appoint one of her offshore HLCV’s to complete this project in early 2019 Photograph – Jumbo

Date 6 November 2018

Jumbo’s Offshore division has been awarded the contract by Technip to perform the task of lowering the manifold onto the seabed at a 1643m water depth and installing various other SSIV’s and valve skids at a water depth of approximately 86m. In addition to this, Jumbo will also transport various equipment from US Gulf Coast to Eastern Mediterranean.

Technip’s preparation for the project includes a subsea production system connecting high-rate subsea wells to a fixed platform located approximately 10km offshore Israel.

The Jumbo team will also provide reliable project management and engineering services for this scope of work, including attendance of HIRAs and review of Technip procedures and analyses.

Jumbo will appoint one of her offshore HLCV’s to complete this project in early 2019. By using one of our DP equipped heavy lift construction vessels with its combination of transport and deepwater installation capabilities, we can provide a unique solution for the transportation and installation aspects of this project.” Brian Boutkan, Head of Sales & Business Development Americas, Jumbo Offshore.

Project details

The Leviathan Field is located in the I/14 Leviathan North and I/14 Leviathan South leases, approximately 125km west of Haifa, Israel, and 35km west of the Tamar field in the eastern Mediterranean Levantine Basin. Water depth ranges from 1,600m to 1750m.

Source Jumbo

Related news