Heavy Lift Vessel RED ZED 1 Arrives in Rotterdam with Submarine Cables for Hollandse Kust (west Beta) OWF – Heavy Lift News
19 Apr 2024

Heavy Lift Vessel RED ZED 1 Arrives in Rotterdam with Submarine Cables for Hollandse Kust (west Beta) OWF

On Wednesday the heavy lift vessel RED ZED I arrived in the port of Rotterdam with the submarine cables for Hollandse Kust (west Beta). The cable carousels are loaded on a cable barge which will be towed to Amsterdam

 

 

The cables will connect RWE’s offshore wind farm to TenneT’s national electricity grid.

Fortunately, the journey from China to the Netherlands via the Red Sea and the Suez Canal went without any problems for the crew, the ship and TenneT’s 700 megawatt AC cable sections.

 

The contractor will mobilise the fleet and lay it off the coast of Velsen for the installation of the two submarine cables in mid-May,

Source   

 

 

 

Related news