Felbermayr in Action on the Tetlow Canal Railway Bridge in Berlin – Heavy Lift News
1 Sep 2023

Felbermayr in Action on the Tetlow Canal Railway Bridge in Berlin

To maintain the infrastructure in Germany, many bridges are scheduled to be replaced.

This week a team of Felbermayr Engineered Solutions has been working on the installation of two of them in Berlin for the railway bridge crossing the Teltow Canal.

A calm and professional atmosphere enabled the well controlled skidding work. Great to see the new Felbermayr equipment fresh and  in action.

Their next job is the the bridge at Wesel is being installed by means of their SPMT‘s in combination with a 500t jacking system.

 

 

 

Source

Related news