

Eager.one’s Jacket Lifting Tool Ready for Lift-off
Just before the start of summer an important Site Acceptance Test (SAT) took place at the premises of SK oceanplant in South Korea.
Earlier this year, a custom designed and constructed Jacket Lifting Tool was disassembled into parts in The Netherlands and shipped into (standard) shipping containers to South Korea. After safe travels the Jacket Lifting Tool was completely reassembled on-site and ready for commissioning.
The tool was subjected to an extensive Site Acceptance Test by the SK Oceanplant team including a test lift of a Jacket Transition Piece, in close cooperation with the Eager.one project manager who was present on-site. After completion, the Jacket Lifting Tool was found to have passed the test with flying colors.
Many thanks to the team of SK Oceanplant for the great cooperation and the trust they have put in Eager.one. Eager.one are looking forward to future collaborations on new projects for lifting and handling equipment in offshore wind.


Source
Related news


Jacket and TP Lifting Tools from Temporary Works Design – TWD
Offshore Wind Farm Contractors continuously aim to complete their projects more efficiently and safely. TWD assists contractors by providing designs for mission equipment, such as jacket and TP lifting tools, that are tailored to perform in the offshore operation.

Eager.one’s Jacket Lifting Tool Plan Comes Together for SK Oceanplant
