Bridon-Bekaert selected for Equinor Hywind-Tampen Mooring by Aker Solutions (Kvaerner) – Heavy Lift News
23 Nov 2020

Bridon-Bekaert selected for Equinor Hywind-Tampen Mooring by Aker Solutions (Kvaerner)

Equinor’s Hywind Tampen project has been awarded to Bridon-Bekaert Ropes Group (BBRG) by Aker Solutions (Kvaerner) with a contract to supply 35 long-term mooring lines for 11 floating offshore wind turbines including spares.

Hywind Tampen will power the Snorre and Gullfaks fields with wind generated electricity. (Image courtesy of Equinor)

BBRG will supply their SPR2+ product in lengths of 147m of sheathed spiral strand, complete with high strength easy to connect sockets on custom designed offshore installation reels.

The Hywind Tampen project is an 88 MW floating wind power project intended to provide electricity for the Snorre and Gullfaks offshore field operations in the Norwegian North Sea. It will be the world’s first floating wind farm to power offshore oil and gas platforms and the world’s largest floating offshore wind farm, essential in industrializing solutions and reducing costs for future offshore wind power projects.

Equinor’s Hywind Tampen project will be the first floating wind array using steel spiral strand as mooring lines, a solution balancing the need for strength, compliance, and maximal robustness against cutting or abrasion.

BBRG is committed to help accelerate the development of the floating wind market through its global manufacturing footprint and its complete portfolio of mooring solutions, both steel and synthetic.

Featured Title image courtesy of Equinor

Source BBRG

 

 

Related news