Autokrane Schares GmbH Install Two 100t Railway Bridge Sections under Power Lines – Heavy Lift News
19 Aug 2024

Autokrane Schares GmbH Install Two 100t Railway Bridge Sections under Power Lines

From the the 6th to the 8th of August the heavy lift team from Autokrane Schares GmbH, installed two 100t railway trough bridge sections under overhead power lines in Frenchen, 10km from Cologne.

 

 

Their Liebherr LTM1450 placed the troughs onto Cometto SPMTs fitted with Enerpac JS250 jacks to successfully position, raise and install the trough bridges.

 

 

 

Source  

 

 

 

 

Related news