
11 Jun 2021
ALS shipped 36 pieces of wind energy equipment for an offshore wind farm from Adwen GmbH Bremerhaven Labradorhafen to Siemens in Esbjerg.
The heaviest piece was a 170t Triebstrang and the biggest pieces were Rotorstacks which were 8.40 meters high.
ALS arranged the vessel charter and permits for all the shipping, transportation.
Source ALS