TWD on the Thames
A 100m long concrete culvert has been immersed in the Thames, right in the center of London. This vital part of London’s new Super Sewer had to be floated-out underneath the historic Blackfriars Bridge. Read On...
ALE has used its in-house expertise to design, supply, install and perform a bespoke onsite load application, the first load test of its kind in Europe when conducting the progressive loading of a test pile in central London, UK. At 5121t, it was also the highest load test on a pile within Europe.
ALE’s testing equipment enabled the ground model to be confirmed on site for the future main build structure of the new 21 Moorfields building, a mixed retail and office redevelopment. The client supplied the load schedule of the 16-storey buildings test pile up to a maximum load of 50Mn (circa 5,000t).
Specialist weighing equipment needed to be positioned prior to the commencement of test truss assembly. The pile test loading and unloading cycle fluctuated in load up to a maximum of 52.2Mn in line with the engineer’s requirements. The test then took place over a three-day period, running 24 hours a day.
Source ALE
A 100m long concrete culvert has been immersed in the Thames, right in the center of London. This vital part of London’s new Super Sewer had to be floated-out underneath the historic Blackfriars Bridge. Read On...