ALE on Refinery Upgrade with Lifts and Transport

Lindsey Oil Refinery is one of the biggest refiners of crude oil in the UK, producing around 10 million tons per year. In 2018 the facility celebrated its 50th year of production and has continued to look to the future. Over the last two decades the refinery has been improving its capability to produce ultra-low-sulphur fuels so that it can become a cleaner and more efficient operation.

An installation was planned as part of wider maintenance and upgrades during a plant turnaround. Such turnarounds require large investment and are planned in detail, so it was vital that the project was kept on track.

ALE was tasked with lifting and transporting the new sulphur storage facility, which consisted of a concrete pit, weighing 304t, and its lid, weighing 90t. The new pit had been cast into the ground so had to be lifted with a large degree of precision. At 17m long and 4.1m wide, the pit’s size would also make it challenging to transport.

To lift the sulphur pit, ALE mobilised their Lift ‘N’ Lock gantry lifting system. The system’s jacking points can all operate in unison to maintain optimum control and safety.

The Lift ‘N’ Lock system was rigged with a bespoke rigging arrangement to lift the sulphur pit, then ALE manoeuvred specialist 3 file SPT axles beneath it. The pit was transported almost two miles to its final location along public and site roads.

Source ALE