
9 Aug 2022
EDF have published their video of the 5,000t concrete cooling water intake heads for Hinkley Point C being prepared for installation out on the seabed of the Bristol Channel.
The intake heads and the 3,000t outfall heads have been constructed by the engineering and construction specialists Kilnbridge working safely and efficiently throughout the pandemic.
Source EDF
Joint Sumitomo Mitsui Construction/FHECOR/Mammoet innovation solves challenge of increasing hub heights