Sun shines on offshore wind project

Sun shines on offshore wind project

Sun shines on offshore wind project

August 21 - Jiangsu Sunshine International Logistics has handled the transportation of 16 monopiles for an offshore wind farm.

heavyliftpfi.com - News Desk

Monday 21 August 2017

Jiangsu Sunshine was responsible for the overland transportation, port loading and ocean carriage of the monopiles, the heaviest of which weighed 501 tons (454.5 tonnes), measuring 73 m in length and 5 m in diameter.

Other monopile pieces measured 84 m in length, with a diameter of 2 m and a weight of 120 tons (109 tonnes).

Sun shines on offshore wind project

In a separate project, Jiangsu Sunshine handled the shipment of seven boats from a production factory in Zhuhai, China to Rades in Tunisia.

According to the Worldwide Project Consortium (WWPC), of which Jiangsu Sunshine is a member in China, the boats were loaded onto a vessel in Shenzhen for direct delivery to Rades.  SOURCE: HLPFI

www.csspco.com

www.wwpc.eu.com


Liked this post?

Please, give the poster some credit for his/her efforts.

Comments

No comments, yet

{{item.nick}}{{item.tstamp|unixtime}}{{item.credit}}

{{item.content}}

Login

Add Comment