Sarens Completes Transport and Lift at Fort Hills Oil Sands Project

Sarens Completes Transport and Lift at Fort Hills Oil Sands Project

15 Feb. 2017

Sarens transported and lifted solvent bullets, modules, and flare stack sections

The Fort Hills, Alberta oil sands mining project is considered to be one of the most promising oil sands assets in the region. Operated by Suncor, the project is expected to produce up to 180,000 barrels per day for approximately the next 50 years, and to create 1,600 permanent jobs for people in the region.

Sarens contributed to the project by transporting and lifting 11 solvent bullets and over 200 modules. Each of the 49m-long solvent bullets weighed 390T, and the 30m-long modules weighed up to 140T. Sarens was also responsible for lifting 80T flare stack sections and erecting them at a height of 137m.

The Sarens team, comprised of 100 lift crew members and 50 transport crew members, completed the project between August 2015 and January 2017. The rigging equipment alone required 10 tractor-trailer truckloads, transported from Edmonton to the Fort Hills project.

The team faced several obstacles during the operation, including remote working conditions, freezing temperatures approaching -35°C, and the challenge of erecting a flare stack at such a great height. 

"The project was extremely challenging," says Sarens project manager Chris Guenette, "but we were able to perform it to a very high safety and operational standard." 

Sarens used the following equipment during operations:

  • CC8800-1 SSL

  • CC6800 SWSL

  • (3) LR 1600/2

  • CC2500-1

  • CC2400-1

  • Kamag 2400 SPMT

SOURCE: Sarens


Liked this post?

Please, give the poster some credit for his/her efforts.

Comments

01/03/17 @ 20:410

I'm not sure where the info documented came from but the total numbers are off by a lot. Over 700 modules set by Sarens and over 70 vessels.

{{item.nick}}{{item.tstamp|unixtime}}{{item.credit}}

{{item.content}}

Login

Add Comment